Setup, Compatibility & Care
Installation is straightforward: ensure the ground is cleared of sharp debris or large stones before rolling out the membrane. When overlapping sections, aim for a minimum overlap of 150mm to 300mm to ensure continuous filtration. If the membrane is being used on a slope, overlap the upper sheet over the lower sheet to ensure water flows correctly. No specialized maintenance is required; once buried beneath your aggregate or soil, the material is designed to be permanent and maintenance-free. Always ensure the fabric is not left exposed to long-term UV rays, as it is designed to perform once covered by your chosen finishing material.