Extra Long Lead Rope - Shires - Blue

A useful extra long lead rope with a brass swivel trigger clip. Length: 3m (118"). The Shires Extr...

Best current price£6.74from VioVet

All Offers

2 offers from £6.74 - £7.19

View price history by clicking the chart icon.

VioVetShires Extra Long Lead Rope - Navy Metres Size 3
£3.49 delivery
£6.74
Visit shop
GS EquestrianShires Extra Long Lead Rope - Navy / One Size
Free delivery in 1–3 days
£7.19
Visit shop

Product Information

Full details

This guide is for horse owners seeking a reliable and versatile lead rope for their equine companions. The Shires Extra Long Lead Rope offers extended reach for leading, tying, and groundwork, providing greater flexibility and control. Note that while this rope is durable, it's essential to inspect it regularly for wear and tear to ensure safety.

All features

ColourBlue
Model Part Number036/440NVY
BrandShires

Extended Product Information

FAQs

What is the length of the lead rope?

The lead rope is 3 meters (118 inches) long.

What material is the lead rope made of?

The lead rope is made from soft-feel braided rope.

What is the purpose of the trigger clip?

The trigger clip provides a secure and reliable attachment to the headcollar.

How should I clean the lead rope?

Rinse the lead rope with water to remove dirt and debris and allow it to air dry.

Is the lead rope suitable for all horses?

Yes, it is suitable for various horse breeds and sizes, but always ensure the clip is securely fastened.

What colors are available?

The lead rope is available in a range of colors. Refer to the product information to see available colors.

How do I store the lead rope?

Store the lead rope in a clean, dry place when not in use.

What should I do if the rope frays?

Discontinue use and replace the lead rope immediately.

Troubleshooting

Trigger clip does not fasten securely.

Check the trigger clip for any damage or obstructions. Ensure it is properly aligned and closes completely. If the problem persists, replace the clip or the entire lead rope.

Rope shows signs of fraying or wear.

Discontinue use immediately. Replace the lead rope to prevent potential breakage during use.

Pros and Cons

Pros

  • Provides extended reach for greater flexibility.
  • Made from soft-feel braided rope for comfortable handling.
  • Features a strong and secure trigger clip.
  • Durable and designed for everyday use.
  • Available in multiple colors.

Cons

  • Requires regular inspection for wear and tear.
  • May not be suitable for horses who chew on ropes.
  • The length might be excessive for some situations or users.

Setup, Compatibility & Care

Setup:

  1. Attach the trigger clip to the headcollar of your horse.
  2. Ensure the clip is securely fastened before use.

Compatibility:

  • Compatible with standard horse headcollars.
  • Suitable for use with various horse breeds and sizes.

Care:

  • Rinse the lead rope with water to remove dirt and debris.
  • Allow the rope to air dry completely.
  • Store in a clean, dry place when not in use.
  • Regularly inspect for any signs of wear and tear, such as fraying or damage to the clip.

Price History

DatePrice
Visit shop