Setup, Compatibility & Care
Before installation, clear the intended area of all weeds, debris, and existing grass. Lay down a heavy-duty geotextile membrane to prevent the chippings from sinking into the ground and to suppress unwanted weed growth. Aim for a depth of approximately 40mm to 50mm to ensure complete ground coverage without excess waste. For maintenance, a simple leaf blower can be used on low power to clear away organic matter like leaves and twigs. If the chippings become dusty after a long dry period, a quick rinse with a garden hose will restore the vibrant contrast of the white dolomite and blue marble components.