Foundation Slab Kit - 850kg Ballast and 6 x 25kg Cement Bags
This foundation slab kit provides all the essential materials required for small construction proj...This foundation slab kit provides all the essential materials required for small construction projects such as shed bases or small outdoor slabs. The set includes one 850kg bulk bag of 20mm all-in ballast and six 25kg bags of cement, which are sufficient to mix a concrete slab covering approximately 9 square metres at a 50mm depth. Designed for convenient on-site mixing, this kit ensures you have the necessary quantities to complete your foundation work efficiently.
The Foundation Slab Kit from B&Q is an ideal solution for DIY enthusiasts and homeowners looking to build a stable base for sheds, greenhouses, or small patio slabs. It simplifies the purchasing process by bundling the essential dry materials—850kg of 20mm all-in ballast and 150kg of cement—needed to lay approximately 9 square metres of concrete at a 50mm depth. While this kit offers excellent convenience for small-to-medium projects, users should note that it requires significant manual labor for mixing and does not include water or reinforcement materials like steel mesh.
All features
Model Part Number
1386478
Brand
B&Q
Extended Product Information
FAQs
Can I use this for a driveway?
This kit is intended for small structures like sheds or paths. For a driveway, you would typically require a thicker slab and steel reinforcement.
Does the bulk bag include a crane delivery?
Please check with your local B&Q store regarding delivery capabilities, as bulk bag deliveries usually require specific vehicle access.
Do I need sand in addition to this kit?
No, the 20mm all-in ballast already includes the necessary sand content required for a structural concrete mix.
How long does the concrete take to cure?
While concrete is hard enough to walk on within 24-48 hours, it reaches its full structural strength after approximately 28 days.
What is the shelf life of the cement bags?
If kept in a dry, covered area, cement should be used within 3-6 months of purchase to ensure optimal performance.
Troubleshooting
Concrete is cracking after setting
Cracking is often caused by the concrete drying too rapidly. Ensure the surface is covered or dampened during the initial curing phase.
The mixture is too dry or difficult to work with
Add water in small increments. If the mix becomes too runny, add a small amount of extra cement and ballast, but maintain the recommended ratio.
Surface is uneven or rough
Use a straight-edge board (screed) across the formwork immediately after pouring to level the surface, then finish with a wooden float or steel trowel.
Pros and Cons
Pros
Convenient bundle avoids multiple trips to the store
Pre-calculated material ratios for a 9 square metre area
No reinforcement materials like steel mesh included
Transportation of 850kg bulk bag requires suitable access
Setup, Compatibility & Care
Preparation: Clear the site of debris, excavate to the required depth, and install formwork using timber shuttering to contain the wet concrete.
Mixing: Use a ratio of approximately 1 part cement to 6 parts all-in ballast by volume. Add water gradually until you reach the desired consistency.
Curing: Once the concrete is poured and leveled, cover it with plastic sheeting for 3 to 7 days to prevent it from drying out too quickly, which can cause cracking.
Storage: Keep the cement bags in a cool, dry, and moisture-free environment. Cement will spoil if exposed to damp air or direct moisture before mixing.