Foundation Slab Kit - 850kg Ballast and 6 x 25kg Cement Bags

This foundation slab kit provides all the essential materials required for small construction proj...

Best current price£185.00from The Range

All Offers

2 offers from £185.00 - £210.00

View price history by clicking the chart icon.

The RangeDiscount Materials Foundation Slab Kit 10M² X 50Mm - 850Kg Ballast And 6 X 25Kg Cement Bags - Beige
Free delivery in 1–3 days
£185.00
Visit shop
B&Q - Foundation Slab Kit 10M2 X 50mm Bulk Bag Of Ballast And 6 Bags Of Cement
Free delivery in 1–3 days
£210.00
Visit shop

Product Information

Full details

The Foundation Slab Kit from B&Q is an ideal solution for DIY enthusiasts and homeowners looking to build a stable base for sheds, greenhouses, or small patio slabs. It simplifies the purchasing process by bundling the essential dry materials—850kg of 20mm all-in ballast and 150kg of cement—needed to lay approximately 9 square metres of concrete at a 50mm depth. While this kit offers excellent convenience for small-to-medium projects, users should note that it requires significant manual labor for mixing and does not include water or reinforcement materials like steel mesh.

All features

Model Part Number1386478
BrandB&Q

Extended Product Information

FAQs

Can I use this for a driveway?

This kit is intended for small structures like sheds or paths. For a driveway, you would typically require a thicker slab and steel reinforcement.

Does the bulk bag include a crane delivery?

Please check with your local B&Q store regarding delivery capabilities, as bulk bag deliveries usually require specific vehicle access.

Do I need sand in addition to this kit?

No, the 20mm all-in ballast already includes the necessary sand content required for a structural concrete mix.

How long does the concrete take to cure?

While concrete is hard enough to walk on within 24-48 hours, it reaches its full structural strength after approximately 28 days.

What is the shelf life of the cement bags?

If kept in a dry, covered area, cement should be used within 3-6 months of purchase to ensure optimal performance.

Troubleshooting

Concrete is cracking after setting

Cracking is often caused by the concrete drying too rapidly. Ensure the surface is covered or dampened during the initial curing phase.

The mixture is too dry or difficult to work with

Add water in small increments. If the mix becomes too runny, add a small amount of extra cement and ballast, but maintain the recommended ratio.

Surface is uneven or rough

Use a straight-edge board (screed) across the formwork immediately after pouring to level the surface, then finish with a wooden float or steel trowel.

Pros and Cons

Pros

  • Convenient bundle avoids multiple trips to the store
  • Pre-calculated material ratios for a 9 square metre area
  • Ideal for small residential construction tasks
  • High-quality 20mm ballast ensures structural integrity

Cons

  • Requires manual labor and heavy lifting
  • Does not include water or mixing tools
  • No reinforcement materials like steel mesh included
  • Transportation of 850kg bulk bag requires suitable access

Setup, Compatibility & Care

  1. Preparation: Clear the site of debris, excavate to the required depth, and install formwork using timber shuttering to contain the wet concrete.
  2. Mixing: Use a ratio of approximately 1 part cement to 6 parts all-in ballast by volume. Add water gradually until you reach the desired consistency.
  3. Curing: Once the concrete is poured and leveled, cover it with plastic sheeting for 3 to 7 days to prevent it from drying out too quickly, which can cause cracking.
  4. Storage: Keep the cement bags in a cool, dry, and moisture-free environment. Cement will spoil if exposed to damp air or direct moisture before mixing.

Similar items

Price History

DatePrice
Visit shop