Setup, Compatibility & Care
Installation requires a clean, dry, and level subfloor. Begin by acclimatizing the tiles in the room for at least 24 hours before laying. Use the click-lock system to snap edges together; no adhesive is required. When installing over radiant heating, ensure the floor surface temperature does not exceed the manufacturer's specified limits. For daily care, sweep or vacuum using a soft-bristled attachment. Use a damp mop with a pH-neutral floor cleaner for deeper cleaning. Avoid using steam mops, wax, or abrasive scrubbing tools, as these can damage the finish or the locking mechanism.