Setup, Compatibility & Care
Before installation, ensure the pond pump is completely powered off and the system pressure is released. Remove the metal clamping ring that holds the lid to the canister body. Carefully lift the old lid, noting the position of the internal connection ports. When installing the new assembly, ensure the main canister O-ring is seated correctly in the groove to prevent leaks. Once the lid is positioned, re-attach the clamp securely. Regularly wipe the lid with a damp cloth to remove debris, and check for signs of cracking or UV degradation during seasonal pond cleanings.