Marsh ENSIGN ULTRA 10 Person Sewage Treatment Plant - PSLC2-SO

The Marsh ENSIGN ULTRA sewage treatment plant is designed for reliable underground wastewater mana...

Best current price£53.34from Professional Building Supplies

All Offers

12 offers from £53.34 - £5,159.32

View price history by clicking the chart icon.

Professional Building SuppliesDurasid Red Foresta Wood Effect Cladding Two-Part Edge Trim - 3Mtr Cedar
Free delivery in 1–3 days
£53.34
Visit shop
PVC Cladding UKDurasid Red Foresta Wood Effect Cladding Two-Part Edge Trim - 3Mtr Cedar
Free delivery in 1–3 days
£53.34
Visit shop

Product Information

Full details

The Marsh ENSIGN ULTRA 10 Person Sewage Treatment Plant (PSLC2-SO) is an advanced underground wastewater management solution designed for residential or commercial properties hosting up to 10 individuals. It offers exceptional environmental performance with a 97% pollutant removal rate, though its large underground footprint requires careful site planning and professional excavation for installation.

All features

Model Part NumberPSLC2-SO
BrandMarsh

Extended Product Information

FAQs

How many people can this system serve?

This specific model is rated for a capacity of up to 10 people.

What is the structural guarantee?

The unit comes with a 25-year structural guarantee.

Does it meet environmental standards?

Yes, it conforms to BSEN12566-3/A1:2009 standards and achieves a 97% pollutant removal rate.

Why is there an alarm on the unit?

The Beacon Alarm and pressure switch monitor internal pressure to alert you of potential blockages or compressor failures early.

Is installation simple?

Installation requires professional excavation and setting as it is an underground system; it is not a DIY task.

How long is the compressor warranty?

The compressor is covered by a 2-year manufacturer's guarantee.

Troubleshooting

Beacon alarm is flashing or sounding

The pressure switch has detected a drop in internal pressure. Check the compressor for function and examine the pipework for potential blockages.

System odor is noticeable

Ensure the system is correctly vented and that the compressor is running properly to maintain aerobic conditions.

Compressor stops working

Check the power supply connection to the compressor and consult the 2-year compressor guarantee documentation for professional repair.

Pros and Cons

Pros

  • High pollutant removal rate of 97%
  • 25-year structural guarantee for long-term confidence
  • Integrated alarm system prevents potential spills and blockages
  • Engineered for durability with stable, impermeable components

Cons

  • Requires professional excavation and underground installation
  • Compressor requires maintenance and has a shorter 2-year guarantee
  • Large footprint may not be suitable for constrained plot sizes

Setup, Compatibility & Care

Installation must be performed by qualified professionals due to the need for excavation and connection to the property's drainage lines. Ensure the unit is placed on a stable surface using its built-in stabilising feet to prevent shifting. The system is designed to be low maintenance, but regular checks on the compressor and annual servicing are recommended to maintain the 97% pollutant removal efficiency. Always keep the lid clear of debris and ensure the area surrounding the unit is protected from heavy vehicle traffic unless specifically reinforced.

Similar items

Price History

DatePrice
Visit shop